highwayman
Knows Less Than PJ Fleck
- Joined
- Jan 4, 2009
- Messages
- 8,052
- Reaction score
- 1,752
- Points
- 113
$21M was spent on leaky windows. $48M needed next year to fix a host of problems. It makes it look like they built in obsolescence from the start. It makes the U stadium debt look like a pittance.